Case Study

Yare House, Thorpe Road, Norwich

The rejuvenation of a 70's office building into a modern grade A office accommodation required a modern, flexible air conditioning system.

A Mitsubishi energy efficient heat pump VRF simultaneous heating and cooling system was the perfect selection to meet the client's criteria. With each of the floor areas split into halves the landlord can let individual areas out and tenants can sub divide their area and still maintain individual control of their offices. The central controls are state of the art touch screens and allow full control of the air conditioning system.

Works included
  • Ceiling Cassettes
  • External VRF Condensing Units
  • Full Central Touch Screen
  • Controllers
  • Air Conditioning Services Installation
  • Condensate Drainage Installation
PROJECT DETAILS

Contract Period
48 weeks

Project Value
£260,000

Client
Highlight Consultancy Ltd

Consultant
Ingleton Wood

Architect
Ingleton Wood

Main Contractor
Morgan Ashurst

<< Back to Case Studies

 
Registered Office: Drayton, Norwich, NR8 6AH | © Eyre Building Services Group Ltd - | Company No. 00817316